Structure and sariyaBeing built · in testing

How many sariya? Drafted, then approved by your engineer.

One press lays pillars, beams, slabs and footings on your plan and works them out to the Indian codes: the steel by diameter and bar by bar. Every sheet says Draft for engineer’s check until your engineer approves it.

Sound familiar?

The client wants to know how much steel the house needs before the engineer has seen the plan. The figure is a thumb rule, and the bar bending schedule is made by hand on site.

What changes

01

Proven on the books

Slabs, beams, columns, footings and the frame worked out as the codes’ handbooks do; their worked examples reproduced.

02

It knows when to stop

A basement, a long span, a floating column or a fourth floor: flagged for your engineer, never guessed.

03

Your engineer approves

They open the exact drawings on their phone and approve; only then do the sheets say Good for construction.

Measured, not promised

  • 62 of 62worked examples from the codes’ books reproduced
  • 10 of 10buildings outside the proven range flagged, none drafted
  • 20 of 20gates of the engineer’s approval that hold
Measured in our own tests: made-up buildings (a 10-marla house in Mohali, a corner plot, a clinic) worked by hand and against the codes’ own worked examples, on the app as it is today.

Where it sits in the journey

  1. 01Plot and wants
  2. 02The plan
  3. 03Structure
  4. 04Services and finishes
  5. 05Quantities and cost
  6. 06Each person’s drawings
  7. 07Interiors

Structure: after the plan, before the services; the slab check comes again before each pour.

What it does

  • Pillars, beams, slabs and footings proposed on your plan, with no beam over a stair or through a window.
  • The frame worked out for its loads and for earthquake (IS 456, IS 1893, IS 13920), every number with its clause.
  • The sariya by diameter and member by member; accept it or change a bar, and the quantities follow.
  • The steel fixer’s and shuttering carpenter’s drawings: schedules, beam and slab details and the bar bending schedule with 12 m bars.
  • Outside the proven range (above ground + 2, a basement, a long span, weak soil) it says so and prepares the numbers for your engineer.
  • Your engineer reviews and approves from their phone; a later change ends the approval and says so.

In the app

16,405 kg of sariya drafted: Draft for engineer’s check · in testing.
16,405 kg of sariya drafted: Draft for engineer’s check · in testing.
The engine’s suggestions, each with its reason and clause.
The engine’s suggestions, each with its reason and clause.
The sariya by diameter, in 12 m bars.
The sariya by diameter, in 12 m bars.
What your engineer checks, each with its clause.
What your engineer checks, each with its clause.

Real screens from our demo studio, Atelier Neev (fictional data).

Questions

Is the sariya safe to build from?

Not until your structural engineer says so. Every structural sheet, schedule and steel number says “Draft for engineer’s check · in testing” until your engineer approves the exact drawings through the app; only then do they say Good for construction.

Which codes does it follow?

IS 456 for concrete, IS 875 for loads, IS 1893 for earthquake and IS 13920 for detailing, with the official handbooks’ worked examples as its tests. Each rule names its clause.

What if my engineer uses their own software?

They can: the frame goes out as a file for their analysis software and their columns can come back onto your grid.

Coming soon

Sign-up is coming soon

We’re launching very soon. Leave your name and an email or a mobile number, and we’ll tell you the day it opens.

See everything we’ve shipped

An email or a mobile number is enough.

We use these details only to tell you when sign-up opens.