Quantities and costBeing built · in testing

Every brick counted. Every rupee to the paisa.

Measured from the model the IS 1200 way with the working shown, bricks, cement and sand for every wall, then priced from the Punjab or CPWD schedule or your own rates, straight into the BOQ and the budget.

Sound familiar?

The estimate is made from the drawing with a scale and a calculator. Then the plan changes, nobody measures it again, and the BOQ and the site disagree by lakhs.

What changes

01

Measured, with its working

Every item shows where it came from: which wall, which slab, which deduction.

02

Bricks to the brick

Your kiln’s brick and mortar: bricks, cement bags and sand for every wall, live as you draw.

03

One number everywhere

The cost page, the BOQ, the Excel and the sheets agree to the paisa.

Measured, not promised

  • 791 of 791items within 3 % of hand take-offs on six buildings
  • 17 of 17brickwork worked examples exact, to the brick
  • 974 of 974money totals the same in two places, to the paisa
Measured in our own tests: made-up buildings (a 10-marla house in Mohali, a corner plot, a clinic) worked by hand and against the codes’ own worked examples, on the app as it is today.

Where it sits in the journey

  1. 01Plot and wants
  2. 02The plan
  3. 03Structure
  4. 04Services and finishes
  5. 05Quantities and cost
  6. 06Each person’s drawings
  7. 07Interiors

Quantities and cost: from the first plan, and again after every change.

What it does

  • Earthwork, concrete, shuttering and sariya from the structure; brickwork, plaster, floors, tiles, doors and paint from the building.
  • Every item with its working: lengths, heights, deductions, as IS 1200 measures it.
  • Bricks, cement and sand per wall and per floor, in your brick size and mortar; a contractor’s estimate as a PDF.
  • Priced from the Punjab CSR or CPWD DSR with their item numbers, or your studio’s own rates; storey and city extras applied.
  • Into the project’s BOQ and budget in a press, and kept in step when the model changes.
  • Excel for your quantity surveyor; the same totals everywhere.

In the app

The building’s cost from the Punjab schedule: ₹44.86 lakh.
The building’s cost from the Punjab schedule: ₹44.86 lakh.
By trade and by floor.
By trade and by floor.
Each line with its schedule item and page.
Each line with its schedule item and page.
Measured from the model: digging, concrete, sariya, shuttering.
Measured from the model: digging, concrete, sariya, shuttering.
Brickwork, plaster, floors, doors and paint, with bricks, cement and sand below.
Brickwork, plaster, floors, doors and paint, with bricks, cement and sand below.

Real screens from our demo studio, Atelier Neev (fictional data).

Questions

Can I use it on my projects now?

It is being built and in testing. Try it on the sample house in the demo studio and on your own plots; tell us what is missing. Your existing plans and drawings are never changed by it.

Whose rates does it use?

The Punjab CSR 2020 or the CPWD DSR 2023, read with their item numbers, or your own rates, which win where you set them.

How exact are the bricks?

Our worked examples come out to the brick and the cement to a tenth of a kilogram; on site, wastage is a setting you choose.

Coming soon

Sign-up is coming soon

We’re launching very soon. Leave your name and an email or a mobile number, and we’ll tell you the day it opens.

See everything we’ve shipped

An email or a mobile number is enough.

We use these details only to tell you when sign-up opens.